NXI-1, Re, 10ID August 2011
Projects
Previous Studies
Notes
Re foil referenfce
Re EDGE |
|||||||
# |
filename |
description |
Temp |
Gas |
EXAFS/XANES |
Done |
PIC |
Re Foil reference |
|||||||
step 1 |
11Aug_Re1.001-2 |
As Received at RT in air |
RT |
Air |
2 EXAFS |
done |
|
Experiment 1: Reduction
Re EDGE, Reduction Experiment |
|||||||
# |
filename |
description |
Temp |
Gas |
EXAFS/XANES |
Done |
PIC |
NXI-1B 34235-35, 0.5% Re/25% MFI-80 (UOP#80-2225)/75% Al2O3 |
|||||||
step 1 |
11Aug_Re2.001-2 |
As Received at RT in He |
RT |
100% He |
2 EXAFS |
done |
|
step 2 |
Start H2 at 150sccm, wait 5min, then start ramp and data collection |
||||||
step 2 |
Reduce: Ramp to 500C at 5deg/min in 150sccm H2, dwell 45min |
||||||
step 2 |
11Aug_Re2.003-121 |
watch During reduction |
RT to 500 |
100% H2 |
XANES |
done |
|
step 3 |
Cool to RT in H2 |
||||||
step 3 |
11Aug_Re2.123-131 |
after reduction |
RT |
100% H2 |
9 EXAFS |
done |
|
Experiment 2: Dry and then Reduce
Re EDGE |
|||||||
# |
filename |
description |
Temp |
Gas |
EXAFS/XANES |
Done |
PIC |
NXI-1B 34235-35, 0.5% Re/25% MFI-80 (UOP#80-2225)/75% Al2O3 |
|||||||
step 1 |
11Aug_Re3.003 |
As Received at RT in He |
RT |
100% He |
1 EXAFS |
done |
|
step 2 |
Oxidize: ramp to 500C at 5deg/min in 100sccm 20%O2/He, dwell 30min |
||||||
step 2 |
Start O2/He wait 5min, then start ramp and data collection |
||||||
step 2 |
11Aug_Re3.004-102 |
watch During drying |
RT to 500C |
20% O2/He |
xanes |
done |
|
step 3 |
cool to RT |
||||||
step 3 |
11Aug_Re3.103-106 |
dried sample |
RT |
O2/He |
4 exafs |
done |
|
step 4 |
purge with He |
||||||
step 4 |
Reduce, ramp to 500C at 5 deg/min in 150sccm 100% H2, dwell 45min |
||||||
step 4 |
11Aug_Re3.108-225 |
watch During reduction |
RT to 500C |
100% H2 |
xanes |
done |
|
step 5 |
cool to RT in H2 |
||||||
step 5 |
11Aug_Re3.226-241 |
reduced EXAFS spectra |
RT |
H2 |
16 exafs |
done |
|